Waukesha Memorial Hospital Parking

This 983-car, cast-in-place parking structure has two elevated post-tensioned concrete decks. As part of the project, a partially underground tunnel leading to the hospital was constructed. Of the 308,000 total square feet, 200,000 square feet consists of elevated, post-tensioned, concrete slabs. CG Schmidt self-performed all of the cast-in-place concrete work on this project which received a Decorative Concrete Design Award from Wisconsin Ready Mixed Concrete Association.

Architect: Engberg Anderson

Location: Waukesha, Wisconsin